An electrical field-level hazard assessment (FLHA) checks whether the approved electrical work method still fits the equipment, people and conditions at the point of work. It is a short discussion and record before work starts or resumes. It does not replace the qualified worker's isolation procedure, test for absence of voltage, energized-work authorisation where lawful, utility rules, arc-flash assessment, permit, rescue plan or the employer's formal hazard assessment.

The Canadian Centre for Occupational Health and Safety (CCOHS) hazardous-energy guidance describes how controls depend on the actual energy and task. Its arc-flash guidance says to avoid energized work whenever possible and follow the relevant lockout programme. For an Ontario construction example, the Ministry of Labour electrical-hazards page discusses qualified workers, isolation and verification under Ontario Regulation 213/91. Those Ontario provisions are not a national procedure: apply the current law and utility/owner rules where the job is done.

Work identity and formal authorisations

FieldActual job entry
Site, equipment/panel/circuit ID and location
Province/territory or federal jurisdiction and applicable owner/utility rule
Employer, qualified worker(s), supervisor and adjacent trades
Exact task and work boundary
Approved electrical work plan and hazard assessment reference
Isolation/lockout procedure and certificate/permit reference
Test instrument, competent tester and verification record reference
Arc-flash/shock assessment and required boundary/PPE reference
Rescue, first aid and emergency contact
Date, time, version and change/review trigger

Identify every electrical and other energy source that may affect the task, including backfeed, generators, stored energy, UPS, solar, batteries and adjacent live parts. The employer's qualified person decides the actual isolation points and verification sequence. Do not let a copied FLHA table define the test method or safe approach distance.

Point-of-work change check

Observation to verifyActual conditionDifference from approved plan?Action and owner
Correct equipment/circuit identified, drawings current
Other feeds/backfeed/storage identified
Isolation points and lock ownership match work
Test equipment and qualified tester available
Enclosure condition, moisture, contamination or damage
Exposed adjacent live parts and barriers
Arc-flash/shock boundaries and people nearby
Cables overhead/underground; plant movement or excavation
Access, egress, lighting, weather and footing
Communications, rescue and emergency access

“Same as yesterday” is not enough if equipment has been switched, contractors have connected temporary power or rain has entered an enclosure. Compare the observations with the approved method. If the identification or isolation is uncertain, stop and ask the owner/qualified person to resolve it.

Step-by-step field risk record

Work stepCredible electrical or related consequenceEngineered/isolation control already verifiedAdditional action and person responsibleHOLD / release
Access and secure work area
Identify/coordinate feeds
Isolate and verify under approved procedure
Carry out authorised work
Inspect, restore and hand back

The FLHA can reference an isolation certificate and record that the qualified team verified it. It must not contain a generic “test dead” tick as a substitute for a complete absence-of-voltage procedure. The CCOHS lockout guidance explains why disconnecting a control switch alone is inadequate and why stored energy must be addressed. The person who performs the electrical test must use a suitable instrument and documented method under the applicable rules.

Energized work is a separate decision

Do not use this field form to normalise live work. First ask whether the equipment can be made electrically safe. If a jurisdiction permits work on or near energized equipment in narrow circumstances, a competent authority must document the reason, the legal conditions, qualified people, safe boundaries, controls, PPE, supervision and rescue under the actual law and work procedure. Ontario's construction electrical guidance describes specific provincial rules; another province or utility may differ. A blank “live work approved” checkbox cannot make an unsafe method lawful.

Stop-work and release

Immediate stop triggerCompetent next step
Equipment/circuit or feed identity unclearRe-identify with owner and qualified person; update plan
Lock or isolation mismatch, unexpected voltage, failed testMake safe; follow formal isolation/test investigation
Water, damage, new exposed parts or changed arc-flash boundaryReassess condition and controls before access
Unauthorized person enters boundarySecure area and rebrief
PPE/test equipment unsuitable, rescue unavailableObtain correct equipment and competent plan
Task changes or new contractor/temporary power appearsStop and coordinate; revise formal approval if needed
Hold/release recordEntry
Work stopped and area made safe at
Qualified electrical lead/owner contacted
Actual fault/change and underlying plan affected
Investigation, repair or revised isolation evidence
People and adjacent trades rebriefed
Named competent person releasing work, scope and time

Do not write “supervisor aware” in the release field unless the work has actually been reassessed and the supervisor has authority to release it. A significant test failure may require investigation beyond the current shift.

Worker briefing and close-out

Briefing/close-out itemName/date/evidence
Qualified people and roles confirmed
Isolation and verification record located and understood
Boundaries, observers and other trades coordinated
Emergency response and first-aid arrangements confirmed
Workers can state the stop condition
Tools removed and equipment restored under approved procedure
Locks/tags and owner handback handled by authorised people
Defects and follow-up actions assigned

Example: A crew arrives to service a motor control panel. The approved isolation list refers to one supply, but the panel now has a new backup feed. The FLHA identifies the mismatch and the crew stops. The equipment owner and qualified electrician update the source identification and isolation plan, verify safe condition using the approved procedure and rebrief those affected. Only then does the competent person release the task. The field card surfaced a change; it did not design or certify the new isolation.

Existing owner and Complys boundary

The live Complys Canada hazard-assessment guide owns the general assessment method. This page owns a copyable electrical workface change check and should link to that guide. The proposed /ca/hazard-assessment-software money route was not verified live in this writer-side search. The CA tools directory lists a general hazard-assessment/JHA builder; that is not evidence of an electrical permit, live-work decision tool, isolation verification or arc-flash calculation. After implementation and plan review, a safe CTA is: Ask Complys to show how the current product records the approved task assessment and follow-up actions. It cannot test a circuit, approve live work or certify an electrical installation.

Source, claim, owner, link, product and writer-side QA register — 5 October 2026

CheckPrimary/observed evidenceDecision / publication gate
Hazardous energy and lockoutCCOHS energy programme, lockoutQualified task-specific procedure; no invented test sequence.
Energized/arc-flash boundaryCCOHS arc flash, Ontario construction guidanceCurrent local law, equipment and qualified specialist review; Ontario is an example.
Existing owner/cannibalisationCA hazard-assessment guideElectrical blank field check is distinct; verify repo/unpublished owner and exact route.
Product/linkCA general tools directoryNo live-work, isolation or arc-flash automation asserted; money route unverified.
Copy QADirect answer, useable identity/change/step/stop/release tables and exampleREADY writer-side; independent electrical/legal/product/canonical and whole-page QA remain.