Electrical Task Analysis Template for New Zealand Construction

Plan electrical work around the actual supply, equipment, people and work area. This New Zealand form supports a task analysis for a site electrician, supervisor and person conducting a business or undertaking (PCBU). It does not authorise an unlicensed worker to perform prescribed electrical work (PEW), determine that a circuit is dead, replace an isolation procedure or issue a certificate. WorkSafe says people carrying out PEW generally need appropriate registration and a current practising licence, and different work can require testing, certification and inspection under the Electricity (Safety) Regulations 2010. The authorised worker must identify the rules for this work, not infer them from a blank template.

Job information and prerequisite evidence

FieldRecord for this task
Site, work zone and precise electrical scope
PCBU, principal contractor and electrical contractor
Authorised electrical worker(s), role and licence check
Site supervisor and person controlling access
Installation/supply description, plans and known alternate feeds
Permit/authority to access or isolate
Temporary works and adjacent trade interfaces
Applicable current standard/code and designer instructions
Test equipment, suitability and checks
Emergency plan, first aid and rescue contacts
Certification/inspection and handover plan

The WorkSafe electrical safety checklist for small construction sites distinguishes site set-up, regular and day-to-day checks and warns that its checklist is not a complete statement of legal duties. Use it to prompt inspection of temporary supplies, leads, residual current devices and communication; use current standards and a competent electrical designer/worker for technical settings and test procedures.

Copyable task sequence

StageSpecific hazard or failureControl and hold pointOwner / evidence
1. Confirm scope and competencyWrong circuit or unauthorised PEWVerify drawings and site conditions, scope of licence, competent supervision, work boundaries and permitted tasks.
2. Coordinate shutdownUnexpected power loss, other trades affected, alternate feedAgree outage with relevant PCBUs/occupants; identify all energy sources, backfeeds and dependent systems.
3. Isolate and secureElectric shock, arc, unplanned re-energisationAuthorised person uses the applicable isolation/lockout process; label and control access. Verify absence of voltage with appropriate equipment and method before touch; record who proved the state.
4. Set safe work areaContact by others, damaged temporary leads, water or poor lightingBarrier/sign the zone, control pedestrians/plant, inspect access, work platform and weather/environment.
5. Carry out workContact with energised parts, fire, wrong materials/connectionFollow current design, standards and manufacturer instructions; protect exposed work; competent supervision and change control.
6. Test and inspectUnsafe installation handed backAuthorised worker performs required tests and arranges independent inspection where the work type requires it. Record results, defects and correction.
7. Re-energise and hand overPerson working on system, unsafe circuit, missing documentationAccount for people and tools, close covers/barriers, agree re-energisation, verify operation and provide legally required certificates/records.

Do not use โ€œswitch offโ€ alone as proof of isolation. The authorised worker must choose the correct technical method and test instruments for the installation. If live work is proposed, stop and obtain a documented task-specific decision under the current legal and technical requirements; this general template does not authorise live work.

Specific site prompts

  • Temporary construction supply: Who owns the distribution board and how are temporary leads protected from water, vehicles, cuts and unauthorised alteration? Are the relevant WorkSafe construction-site electrical checks current?
  • Overhead or buried cables: Have the network owner, location information and safe distances been checked? An excavation or lifting task needs coordination with its own task analysis; see WorkSafe excavation guidance.
  • Other stored or alternate energy: Are batteries, solar generation, generator feeds, UPS equipment or plant isolations relevant to this site? Ask a competent person to identify any backfeed path.
  • Shared work: Has the site manager told other PCBUs what is isolated, what remains live and when the area will reopen? Do not rely on a notice that workers have not seen.
  • Certification: Determine whether a Certificate of Compliance, Electrical Safety Certificate or inspection record is required for the specific PEW. WorkSafe's construction and certification guidance and current regulations govern this; this page does not state that every repair produces the same certificate.

Change, defect and sign-off record

Unexpected condition: ___ . Work made safe and people excluded: ___ . Revised scope/method approved by: ___ . Other PCBUs notified: ___ . New tests or inspection required: ___ . Date/time of rebrief: ___ . If a circuit differs from the plan, stop and re-identify it. A previous licence check or permit does not prove this specific circuit is safe.

Pre-start briefing: workers ___; date/time ___; isolation boundaries explained ___; questions ___ . Hold point released by authorised worker: ___ . Tests/certificates/inspection references: ___ . Handover recipient/date: ___ . A site manager's signature cannot replace an electrical worker's legal certification.

Example: fit-out beside an occupied tenancy

An electrical contractor is adding circuits to a commercial unit while the neighbouring tenancy remains open. The task analysis maps the shared board, identifies the affected circuits and possible alternate supply, agrees a shutdown window with the site controller, barriers the working zone and requires the authorised worker to isolate and verify before touch. It records how emergency lighting and public access are maintained. If the drawings do not match the board, the team stops and revises the plan instead of guessing from a label.

Frequent failures

  • Assuming the same isolation point controls every feed.
  • Letting an unregistered person undertake PEW because a supervisor signed a generic form.
  • Treating an RCD as permission to work on a live circuit.
  • Placing temporary leads across traffic or wet ground without suitable protection.
  • Re-energising before people, barriers and test results are accounted for.
  • Claiming one certificate type always applies to every electrical task.

Page ownership and Complys boundary

This is the NZ electrical task-analysis form, distinct from WorkSafe's official electrical safety checklist, a generic SSSP and other trade task forms. It links to WorkSafe's checklist rather than duplicating it as an official inspection form. Targeted live search found no exact NZ Complys electrical-task template; final current repository/gated-content search remains required. The observed Complys NZ site is a neutral brand link. The proposed /nz/risk-assessment-software money route and any feature claim require direct product/route evidence before a CTA. Complys cannot confer an electrician's licence or issue a statutory electrical certificate.

Primary sources reviewed 6 October 2026: WorkSafe who must comply, construction-site electrical checklist, construction and certification, getting electrical work done. Writer-side QA: no technical isolation procedure or universal certificate claim invented; must be adapted and checked by an authorised NZ worker. Disposition: READY with publication gate above.