Roofing ยท Safe Work Method Statements

Roofing SWMS software for Australia

Build a site-specific SWMS for roof work โ€” the falls, fragile surfaces, pitch, skylights, edge protection, access and weather risks that are particular to roofing โ€” then record acknowledgement, keep versions and evidence, and export a PDF.

When a roofing SWMS is required

A SWMS is required before high risk construction work starts. Roof work is not automatically high risk construction work by name, but it almost always involves a risk of a person falling more than 2 metres, and often work on or near fragile surfaces or the disturbance of asbestos โ€” any of which triggers the requirement. Assess the actual job against the high risk construction work categories rather than assuming from the trade.

Two roofing-specific points matter. Older fibre-cement roofing can contain asbestos; work likely to disturb it is itself high risk construction work and carries separate licensing and controls, so a suspect roof is checked before work starts, not during. And edge protection follows the hierarchy of controls โ€” guardrails and edge protection first, then work positioning, and only then a fall-arrest harness with a rescue plan. Requirements also differ by jurisdiction: most states and territories run the model WHS laws, while Victoria operates under the OHS Act 2004 and OHS Regulations 2017 through WorkSafe Victoria.

Roofing hazards a real SWMS has to cover

A generic template will not stand up. These are the roofing-specific hazards your SWMS should address for the actual job:

Falls from the roof edge

Falls of more than 2 metres from the perimeter โ€” the primary reason a roofing SWMS exists โ€” controlled by edge protection first.

Fragile & brittle surfaces

Fibre-cement, fibreglass, polycarbonate and old sheeting that can fail underfoot โ€” identified and covered or bypassed with platforms.

Roof pitch & slip

Steeper pitches and wet or dusty surfaces increase slip and momentum; anchor points, roof ladders and footwear matter.

Skylights & openings

Skylights, penetrations and unfinished openings a person can fall through โ€” guarded, covered and clearly marked.

Edge protection & fall systems

Guardrails and edge protection first, then work positioning, then fall-arrest harness with a rescue plan as a last resort.

Access to the roof

Ladders, scaffold or an EWP โ€” getting people and materials up and down safely, not just the work on the roof itself.

Weather & wind

Wind lifting sheets, rain making surfaces slippery and heat โ€” stop-work triggers and daily conditions checks.

Materials handling

Lifting and moving sheets, tiles and battens on a pitched surface without overreaching or losing balance.

Falling objects

Tools, offcuts and sheets falling to the ground below โ€” exclusion zones, toe boards and tethering below the work.

How Complys builds your roofing SWMS

The workflow keeps the SWMS specific to the roof and the crew, and keeps the evidence attached to the work:

  1. 1Set the site and project the roof work is for
  2. 2Choose the activity โ€” re-roof, repair, install or maintenance
  3. 3Confirm the high risk construction work that applies
  4. 4Answer the site-specific questions (roof type, pitch, fragile areas, asbestos, openings)
  5. 5Lay out the work steps and their hazards
  6. 6Set the specific controls for each hazard
  7. 7Assign the responsible person for each control
  8. 8Define how controls and conditions are monitored on site
  9. 9Consult the crew and record their acknowledgement
  10. 10Review and re-version when the work, roof or weather changes
  11. 11Export the PDF and keep the evidence against the job

Roofing SWMS โ€” FAQs

Does every roofing job need a SWMS?

Not by name, but most do. A SWMS is required for high risk construction work, and roof work almost always involves a risk of a person falling more than 2 metres โ€” and often work on or near fragile surfaces or the disturbance of asbestos. Any of those triggers a SWMS. Assess the actual job against the high risk construction work categories rather than assuming from the trade.

What about asbestos in older roofs?

Older fibre-cement roof sheeting can contain asbestos. Work likely to disturb asbestos is itself high risk construction work and carries separate licensing and control obligations. A roofing SWMS for an older building has to address whether asbestos is present and how it is managed before work starts โ€” do not treat a suspect fibre-cement roof as ordinary roofing.

How should edge protection be decided?

By the hierarchy of controls. Collective, passive protection such as guardrails or edge protection comes first; then work positioning or travel restraint that stops a person reaching the edge; and only then a fall-arrest harness system as a last resort, with rescue planned. A roofing SWMS should record which control applies to each part of the roof and why.

Does it cover fragile and brittle surfaces?

Yes. Fibre-cement sheeting, fibreglass, polycarbonate and skylights can all fail under a person's weight. The SWMS should identify fragile areas, and set controls โ€” covers, guardrails around openings and skylights, roof ladders or platforms, and no unprotected access โ€” so nobody steps onto a surface that will not hold them.

Does it work in Victoria?

Yes. Most states and territories run the model WHS laws; Victoria operates under the Occupational Health and Safety Act 2004 and OHS Regulations 2017 through WorkSafe Victoria, which also requires a SWMS for high risk construction work. Complys works across both โ€” follow the rules where you work.

Can I export the roofing SWMS as a PDF?

Yes โ€” generate a clean PDF for the site folder or the principal contractor, while the live, versioned copy and the crew's acknowledgements stay in Complys.