Scaffolding ยท Safe Work Method Statements

Scaffolding SWMS software for Australia

Build a site-specific SWMS for scaffolding erection, alteration and dismantling โ€” the falls, falling objects, ground conditions, ties, loading and powerline risks that are particular to scaffolding โ€” then record acknowledgement, keep versions and evidence, and export a PDF.

When a scaffolding SWMS is required

A SWMS is required before high risk construction work starts. Scaffolding is not automatically high risk construction work by name โ€” but in practice erection, alteration and dismantling almost always involve a risk of a person falling more than 2 metres, and frequently work near powerlines or around powered mobile plant, and any of those triggers the requirement. Assess each job against the high risk construction work categories rather than assuming.

Two things sit alongside the SWMS and are often confused with it. A high risk work licence โ€” Basic (SB), Intermediate (SI) or Advanced (SA) โ€” is required for scaffolding work where a person or object could fall more than 4 metres, and is held by the person doing the work. A scaffold inspection by a competent person is required before use, after alteration, incident or adverse weather, and at least every 30 days for a scaffold with a fall risk over 4 metres. The SWMS is a different document from either โ€” Complys keeps all three against the job. Requirements also differ by jurisdiction: most states and territories run the model WHS laws, while Victoria operates under the OHS Act 2004 and OHS Regulations 2017 through WorkSafe Victoria.

Scaffolding hazards a real SWMS has to cover

A generic template will not stand up. These are the scaffolding-specific hazards your SWMS should address for the actual job:

Erection, alteration & dismantling

The highest-risk phases, before edge protection is complete and again as it comes down โ€” sequence, exclusion zones and competent supervision.

Falls from height

Falls of more than 2 metres during build, use and dismantle โ€” the primary reason a scaffolding SWMS exists.

Falling objects

Components, tools and materials falling onto people below โ€” toe boards, containment, exclusion zones and no-go areas.

Foundations & ground conditions

Sole boards, base plates and bearing capacity; scaffold founded on inadequate or uneven ground is a collapse risk.

Ties, bracing & stability

Tie patterns, bracing and the sequence that keeps the scaffold stable through every phase, including partial builds.

Loading & overloading

Rated capacity, load classes and controlling how much material sits on the working platform.

Safe access

Ladder access, stair towers and gates; controlling access to incomplete scaffold with clear tags and barriers.

Powerlines & overhead services

No-go zones and exclusion distances near overhead powerlines, with the network operator involved where needed.

Mobile plant interfaces

Cranes, telehandlers and forklifts working around the scaffold โ€” traffic management and spotters where plant and people mix.

How Complys builds your scaffolding SWMS

The workflow keeps the SWMS specific to the job and the crew, and keeps the evidence attached to the work:

  1. 1Set the site and project the scaffold is for
  2. 2Choose the activity โ€” erection, alteration or dismantling
  3. 3Confirm the high risk construction work that applies
  4. 4Answer the site-specific questions (ground, ties, access, powerlines, adjacent trades)
  5. 5Lay out the work steps and their hazards
  6. 6Set the specific controls for each hazard
  7. 7Assign the responsible person for each control
  8. 8Define how controls are monitored on site
  9. 9Consult the crew and record their acknowledgement
  10. 10Review and re-version when the scaffold or method changes
  11. 11Export the PDF and keep the evidence against the job

Scaffolding SWMS โ€” FAQs

Does every scaffolding job need a SWMS?

Not automatically โ€” but in practice most do. A SWMS is required for high risk construction work, and scaffolding erection, alteration and dismantling almost always involves a risk of a person falling more than 2 metres, and often work near powerlines or around powered mobile plant. Any of those triggers a SWMS. It is the work and the site that decide, not the label 'scaffolding', so assess each job against the high risk construction work categories.

Is a scaffolding SWMS the same as a high risk work licence?

No โ€” they are separate obligations. A high risk work licence (Basic SB, Intermediate SI or Advanced SA) is held by the person doing scaffolding work where a person or object could fall more than 4 metres. A SWMS is the document that sets out how that work will be done safely on this site. You typically need both, plus the workers' White Cards.

Is a SWMS the same as a scaffold inspection or handover?

No. A scaffold from which a person or object could fall more than 4 metres must be inspected by a competent person before use, after any alteration, incident or adverse weather, and at intervals not exceeding 30 days. That inspection record is separate from the SWMS. Complys keeps both against the job so nothing is confused with the other.

Does it work in Victoria?

Yes. Most states and territories run the model WHS laws, but Victoria operates under the Occupational Health and Safety Act 2004 and OHS Regulations 2017 through WorkSafe Victoria, which also requires a SWMS for high risk construction work. Complys works across both โ€” follow the rules for the state or territory you are working in.

Can a principal contractor collect our scaffolding SWMS?

Yes. If you engage scaffolders as subcontractors, Complys lets you collect and check their SWMS, high risk work licences, White Cards and insurance as part of onboarding, before anyone starts on site.

Can I export the scaffolding SWMS as a PDF?

Yes โ€” generate a clean PDF for the site folder or the principal contractor, while the live, versioned copy and worker acknowledgements stay in Complys.