How to build RAMS in 10 minutes: Complete guide for electricians, roofers, scaffolders, groundworkers and builders

Build a complete Risk Assessment and Method Statement in 10 minutes, not 2 hours with templates or a full day from scratch. Guide for electricians, roofers, scaffolders, groundworkers, and builders.

By Complys·7 June 2026·15 min read

You can build a complete Risk Assessment and Method Statement in 10 minutes. Not 2 hours filling in templates. Not a full day writing from scratch. Ten minutes.

That's the difference between using a proper RAMS builder and using what most trades are using now.

The real time cost of RAMS

When you're building RAMS the traditional way—templates, manual rewriting, hunting for the right control measures—the numbers are brutal.

A scaffolder building their first RAMS from scratch: a full day, maybe more. They're researching hazards, writing control measures, structuring the document, checking it covers what an assessor will expect.

Even with a template, you're still looking at 2 hours minimum. You open the template, fill in your company details, realize half the sections don't match your actual work, rewrite them, check you haven't missed anything critical. Two hours later, you hope it's good enough.

With Complys, the same RAMS: 10 minutes.

Not because you're cutting corners. Because you're not starting from scratch or fighting a generic template. You're answering questions specific to your trade and site, and the system generates a complete, trade-specific RAMS with every hazard and control measure already built in.

An electrician using Complys put it simply: "Can't believe how easy it is."

That's not marketing. That's the reality of not having to write.

Why RAMS take so long in the first place

The reason RAMS are time-consuming has nothing to do with complexity. It's the form.

Templates give you sections. Risk assessment, method statement, hazard table, control measures. But they're generic. A scaffolding template that also tries to cover plumbing, electrical, and groundworks doesn't actually help any of them. You end up with blank spaces and irrelevant sections you have to delete or rewrite.

Then there's the thinking part. You need to know: What are the actual hazards on this site? What controls address each hazard? What's the likelihood and severity before controls, and what's the residual risk after? Have I covered everything an assessor expects?

Most RAMS fail because they miss something, or they're so generic that an assessor can't tell if you've actually thought about the specific site. Copy-paste RAMS from old jobs will almost always miss something—a new hazard the old site didn't have, a control that doesn't apply here, a detail that's vague.

That's why rejections happen. And why it's frustrating.

How Complys changes the equation

Complys doesn't start with a blank form. It starts with questions.

What's your trade? Electrician, roofer, scaffolder, groundworker, builder, HVAC, plumber, demolition?

What's the site? Indoor, outdoor, heights, occupied, public exposure, confined space, excavation?

What's the specific work? Installing sockets, replacing roof tiles, erecting scaffolding for a building renovation, laying a foundation?

Once you answer those questions, Complys generates a complete RAMS. Not a template with blanks. A finished document that already knows the hazards for your trade and site, already has the control measures that match your work, already has the risk assessment tables filled in.

You read it, edit if needed, download and submit. Ten minutes, start to finish.

Why this works for each trade

Electricians

Electricians are the highest-searched trade for RAMS—not because they're the most risky, but because they work constantly under conditions that demand them. Commercial sites. Principal contractors. Live services. Permit-to-work systems. Every job is a RAMS job.

And every electrician RAMS has the same core hazards: working with live services, isolation procedures, PPE, earthing and bonding, safe systems of work. The variables are the site (indoor, outdoor, occupied, public), the work (installation, testing, maintenance, fault-finding), and the voltage.

Complys asks you about those variables, then generates a RAMS that covers isolation procedures, testing before work, correct PPE for voltage level, permit-to-work sign-off, rescue procedures. Everything an assessor expects. Everything that keeps your team safe. Without writing it yourself.

One electrician who tested Complys said: "Can't believe how easy it is." He was comparing to template-based systems where he'd have to manually adjust sections, rewrite controls, and hope he'd covered everything. With Complys, the work was done.

Roofers

Roofing RAMS are specific. Height is just the start. You need rescue plans. Working at heights on pitched roofs, especially on detached houses where scaffolding might be full scaffold all the way around or just handrails up the ridges. You need to cover electric cables—overhead power lines near the roof line. You need to cover ditches and undermining, especially on older properties where the foundation might be compromised. You need to cover weather—high wind shutdowns, wet surfaces, cold temperatures affecting grip.

A roofing RAMS that doesn't cover those specifics won't pass. Complys generates a RAMS that covers rescue, height, cable routes, undermine risk, weather precautions—specific to what you're actually doing.

Scaffolders

Scaffolding RAMS are detailed. Load calculations, weather loads, foundation inspections, dismantling sequences, competence verification for the team, inspection schedules. And every job is different. A detached house needs different scaffold than a terrace or a commercial building. A renovation needs different access than new build. Network Rail work needs additional controls.

A template doesn't help because the variables are too many. Complys generates a RAMS that covers the specific scaffold type, the building, the site conditions, and the inspections. Ready to submit.

Groundworkers and civils

Excavation, foundations, utilities. Every ground-works RAMS needs to cover: locating utilities (electricity, gas, water, telecoms), preventing collapse and undermining, competence for the equipment (JCB, excavator, compactor), safe access and egress, noise and dust control. Complys covers all of it. Trade-specific, site-specific, complete.

General builders

Builders often run multiple trades on one site. Scaffold, electrical, plumbing, windows, roofing. Each trade needs a RAMS, and they all need to work together without conflicting controls or gaps. Complys lets you generate separate trade RAMS for each scope of work, so each subcontractor has a document specific to their work.

What you need to know before you build the RAMS

The reason Complys is fast isn't magic. It's because you answer questions that define the site and the work.

If you're out on site surveying jobs—8, 10 jobs in a day—the faster you can capture the right information, the faster you can build the RAMS back at the office.

What information do you need?

For any trade, on any site: Building type (detached, terrace, semi, flat, commercial, industrial), Height of work (ground level, 1st floor, multiple stories, working at height), Utilities nearby (live electrical, gas, water, telecoms), Public exposure (is the public nearby, do occupants work in the space, is it residential), Site access (ladder, scaffolding, confined space, excavation required), Occupied or unoccupied, Weather exposure (outdoor, weather-dependent work), Duration (day job, multi-day, ongoing).

For specific trades: Electricians: voltage, isolation requirements, permit-to-work. Roofers: roof pitch, access method, weather and wind exposure. Scaffolders: building type, load, duration, weather loads. Groundworkers: excavation depth, soil type, utility location. Builders: scope of trades, sequencing.

A worked example: Electrician on a commercial site

An electrician is quoting a rewire job on a commercial office. Three floors, live occupancy, existing installation to disconnect, new circuits to install.

Using traditional templates: Open the template (15 minutes), fill in details (20 minutes), realize the template is wrong for this job and spend 30 minutes rewriting sections, add missing hazards like occupant safety and noise (30 minutes), specify isolation procedures and permit-to-work (20 minutes), proofread for gaps (20 minutes). Total: 2.5 hours.

Using Complys: Open Complys, select Electrician (30 seconds), answer: indoor commercial, live occupancy, existing circuits, new circuits, 3 floors (3 minutes), system generates complete RAMS with isolation procedures, permits, occupant briefing, noise control, emergency procedures (instant), read and edit one section about isolation authority (5 minutes). Total: 10 minutes.

The difference is that Complys already knows what an electrician needs on a commercial site. It doesn't ask you to remember. It generates it.

Why speed matters beyond just saving time

You're not saving 2 hours because you enjoy free time. You're saving 2 hours because: You can quote faster (site survey, RAMS generated, quote completed, all before you leave the property). You get on site faster (a RAMS that takes 10 minutes is built the day before the job, not the morning of). You avoid rejections (a RAMS from trade-specific, site-specific information is a RAMS an assessor approves first time). Your team uses it (a specific, clear RAMS is read and followed, not filed).

That's the real value.

Starting your first RAMS

Your first RAMS with Complys takes 10 minutes because the system does the thinking. Try it with a recent job you've quoted. Answer the trade, site, and work questions. See what Complys generates. Compare it to your template or your last RAMS.

If it covers more hazards, is more specific to your site, and is clearer for your team, then you've just saved yourself 2 hours on your next job. And the one after that. And the next 50 jobs.

What to prepare so the RAMS comes together even faster

The fastest RAMS are not rushed; they are the ones where the inputs were ready before you started. A little preparation removes almost all the friction. Have the basics of the job to hand: the site name and address, the client or main contractor, the dates, and a clear description of the task. Know the team who will do the work and the qualifications and cards behind them, because competence is part of the document. Have your standing information — your insurance details, your accreditations, your usual PPE and equipment — in one place rather than scattered across emails and drawers.

With those ready, generating the document is genuinely quick, because you are supplying details rather than hunting for them. This is also why keeping your company and workforce information current in one system pays off every single time you produce a RAMS: the parts that do not change from job to job are already there, and you only add what is specific to the new job. The ten-minute RAMS is really the reward for having your house in order.

A second worked example: a groundworker on a housing site

Take a groundworks gang starting a foundation dig on a new housing plot. Answering a few questions about the job — excavation to formation level, using a mini-digger, near a marked surface-water drain — produces a document that already knows the headline hazards of the work: trench collapse, buried services, plant and people in the same area, and manual handling. The method comes back with the sequence in order, from scanning and marking services before breaking ground, through supporting the excavation and keeping the exclusion zone around the machine, to guarding the open trench at the end of the day.

The operative then adds the specifics only they know: that the drain runs closer than the plans suggest, so a section will be hand-dug, and that the plot shares access with a delivery route, so timings are agreed with the site manager. A few minutes of review and the RAMS is specific, credible and ready to brief to the gang — a document that would have taken a careful hour to write from a blank page, produced and checked in a fraction of the time.

Fast does not mean careless: the review that still matters

Speed is only a benefit if the document is still right, so the review step is where a fast RAMS earns its credibility. Producing the draft in minutes buys you time to do the part that actually matters — reading it against the real job and making sure the hazards and controls match what you will find on site. A generated document gives you a thorough, well-structured starting point, but the person who understands the work still needs to confirm it fits, adjust anything that is off, and approve it. Done this way, fast and careful are not opposites: the tool removes the tedious drafting, and you spend your attention on the judgement.

The trap to avoid is letting speed become an excuse to skip the check. A RAMS is a legal document and a safety document, and whoever issues it stands behind it. The goal is not a document written in ten minutes and forgotten; it is a document drafted in ten minutes and properly owned by the competent person who signs it off.

When ten minutes is not enough

It is worth being honest that not every job is a ten-minute RAMS. Genuinely complex, high-risk or unusual work — a bespoke temporary works design, a complicated lift, a confined-space entry with difficult rescue arrangements, or a task with several trades tightly interleaved — needs more thought, and sometimes input from a specialist or a designer. A fast tool still helps by handling the routine parts and giving you a strong structure, but the judgement on the difficult elements takes as long as it takes, and rushing it would be the wrong economy.

The right expectation is that the majority of everyday jobs a trade does are well-served by a quick, generated, reviewed RAMS, and that the small number of genuinely complex jobs deserve extra time. Knowing which is which is part of competence, and a good tool supports both — speeding up the routine so you have more time for the exceptional.

Keeping every RAMS you build in one place

Speed of creation is only half the benefit; the other half is never losing what you have made. If each RAMS is a document that gets emailed out and then scattered across folders and inboxes, you pay the time cost again every time you need to find one, prove which version was current, or reuse a similar job's document. Keeping every RAMS you generate in one place — dated, versioned and searchable — means the next similar job starts from something close rather than from scratch, and it means you can produce the right document instantly when a contractor asks which RAMS covered a particular job.

This compounds with the ten-minute creation: the more jobs you do, the larger your body of specific, reusable documents becomes, and the faster and more consistent each new one is. A trade who has both fast creation and organised storage is not just quick on any single RAMS — they have turned the whole task from a recurring headache into a routine that gets easier over time.

FAQ

How is 10 minutes possible? Complys generates RAMS from AI trained on UK-specific compliance frameworks (CHAS, SafeContractor, SMAS, Network Rail, CDM 2015). You answer questions specific to your trade and site. The system generates a complete, trade-specific RAMS instantly.

Will a generated RAMS pass an assessor? Yes, if you answer the questions accurately. Generated RAMS are built to meet assessor expectations for completeness, specificity, and hazard control.

What if the generated RAMS isn't quite right for my job? Edit it. You download a Word document. Add details specific to your site, your team, your procedures. Most users find the generated RAMS covers 95% of what they need.

Can I use the same RAMS for multiple jobs? Not recommended. Each site is different. Complys makes generating a fresh, specific RAMS fast (10 minutes), so each job gets its own.

What if my RAMS is rejected? Feed the rejection notes back into Complys. It regenerates with the feedback incorporated. No rewriting. Just a corrected RAMS.

Does Complys cover my trade? Complys covers: Electrician, Roofer, Scaffolder, Groundworker, Builder, HVAC, Plumber, Demolition, Decorator, Arboriculture, and more. Check the RAMS builder to see if your trade is listed.